E-mon Energy Software User Manual Page 61

  • Download
  • Add to my manuals
  • Print
  • Page
    / 223
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 60
Group and Location
E-Mon Energy User Manual 7-4 E-MON
AMR Schedule
(Call-In or Call-Home)
Panel Group. This panel is required if you are planning to program
the recorder to call-home (E-Mon Energy™). Refer to “AMR” tab for
details on how to create Schedule, Task, and Server. Each of the
locations within this group has the option of inheriting this setup.
Note: Schedule 2, Task 2, and Server 2 are reserved.
Schedule
Select the AMR schedule name that is created on the Schedule panel
of the AMR tab in the Database window. This field will be used to
program to the remote hardware via the Set Call-in AMR button in the
Access Location window.
Task
Select the Task name that is created on the Task panel of AMR tab in
the Database window.
Server
Select the Server name that is created on the Server panel of AMR tab
in the Database window. This field will be used to program the remote
hardware via the Set Call-in AMR button in the Access Location
window.
Event Server This is a reserved field.
Init String 1
Type in the primary init string to program the remote hardware for
setting up the communication module, (e.g., modem).
Init String 2
Type in the secondary init string to program the remote hardware for
setting up the communication module, (e.g., modem).
Enable AMR Check “Enable AMR” to activate this feature for the recorder.
Customize
This button provides access to a dialog box, such as Call Intervals and
Time period, for customizing the AMR schedule. It also displays
location details for call-in start times.
Security
Panel Group. Each of the locations within this group have the option
of inheriting this setup. This is a reserved feature.
Security Password
Select the preset password assigned for that Group. The security setup
is used to program the recorder(s) and for software log-on. Refer to
the “Others” tab for details.
Load Control
Panel Group. This panel is required if utilizing the Load Control
feature. Refer to “Others” tab for details on how to create Load
Control parameters. Each of the locations within this group have the
option of inheriting this setup. This is a reserved feature.
Primary
Select a primary Load Control name. Check the “Enable” box to
activate this feature.
Secondary
This is a secondary Load Control name, similar to the primary. Check
the “Enable” box to activate this feature.
Recorder Parameters
Panel Group. If most of the locations in this group are using the same
recorder configuration, we highly recommend you utilize this feature.
Each of the locations within this group has the option of inheriting
this setup.
Setup Files
From this drop-down, you can select a Recorder setup name. Refer to
“Others” tab for details.
Page view 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 222 223

Comments to this Manuals

No comments