E-mon Energy Software User Manual Page 202

  • Download
  • Add to my manuals
  • Print
  • Page
    / 223
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 201
Glossary
E-Mon Energy User Manual A-5
E-MON
L
% LOAD (PERCENT LOAD)
The percent of a meter’s rated load, which is represented by the load factor graph.
LINE VIEW
Uses a line graph to plot the load in KW.
LIST BOX
A window or dialog component, which lists available choices.
LOAD
The amount of electric power delivered or required at any specific point.
LOAD FACTOR
The percentage difference between the amount used during a specific time period, and the
amount that would have been used if the usage stayed at the highest demand level during
the entire time.
LOCATION
In the E-Mon Energy™ software a location is a collection of recorders/meters. There can be
up to 208 recorders and 1,664 meters per physical location.
LOCATION PANEL
Where you assign the location numbers and set up profile characteristics.
M
MANUAL BILL CYCLE
Generates a bill(s) by predefining a set of customers and meters that may require an
individual billing statement.
MAXIUM PERIOD
(1-8) Refers to the Time of Use periods your day may be divided into in your utility rate
structure.
MAXIUM SCHEDULE
(1-8) Refers to the different seasons that may apply from your rate structure, (i.e. summer
weekdays, winter weekends, etc.) each having different rates.
METER
A meter is a device that measures the customer’s level and volume of energy resources (i.e.
electricity, gas, and water) used.
METER REG
Indicates that the Meter is delivering pulses to the recorder.
METER REPORT
E-Mon Energy Report that saves the results on the status of meters, readings, and flags.
MID PEAK
The energy or demand rate usually applied during weekday business hours.
MODEM
Internal or external serial device that supports the transmission and communication via
telephone lines.
Page view 201
1 2 ... 197 198 199 200 201 202 203 204 205 206 207 ... 222 223

Comments to this Manuals

No comments